The consortium team of Green Project Management (GPM) and Village Green Global Inc. (VGG) plan to build The Institute for Peace and Sustainable Development (“IIPSD”) to be recognized as a leader in Malaysia and the region for the purpose of training in sustainable development. Members of the team are internationally recognized in both project management and sustainability. IIPSD plans to employ and place over 35,000 direct and indirect jobs in the global workforce over the first 5 years of commencement.
Value US $145M
Phase 1
Inland Ports are seen as becoming an integral part of US transportation infrastructure as the greater use of America’s Marine Highways is an answer to congestion on US highways and railroads.
The use of container-on-barge will help reduce the number of trucks on major interstate systems, such as Interstates 70, 64, 75, and 55 all of which have high traffic volumes in close proximity to the inland waterway. The use of Marine Highways can reduce overall fuel consumption and limit the amount of air pollution.
Value US $235M
Phase 1
The Solar Haven Community “SHC” will be a new and advanced renewable energy focused community. The community will be developed and focused to take advantage of advancements in renewable energy, energy management, including photovoltaics, and electric vehicle charging stations.
Value $245M
Phase 1
Green Acres Urban Farm and Research Bio-Park Kansas City, Missouri - USA (Green Acres), is an innovative aquaponics system, designed with a sustainable substructure to vigorously address the impacts of climate change, and local food insecurity.
Green Acres company’s headquarters currently operates within the boundaries of the inner city at East High School (Kansas City, MO) and has stayed true to its mission of providing healthy, low-cost nutritious food while educating the community and providing local jobs in the process.
Approved locations New York State, South Eastern States of USA, Kansas City MO. Durban South Africa and Victoria, Australia
Value $348M
Phase 1
The project is an incubator for agricultural education, research, food crop production and job placement. The project will focus on inclusive, economic and sustainable growth, with full and productive employment and decent work for all. The project will create 23,012 new global jobs in construction, direct and indirect employment over the first 10 years of operation.
Value $135M
Phase 1
A newly formed company of experienced medical professionals that plan to buy out a highly profitable medical training services company. This will not only expand important medical knowledge and qualifications to those who can currently not afford it, but it will also create a significant number of new jobs in the process, along with a host of humanitarian benefits.
Value $328M
Phase 1
The PanEGen “PEG” Waste to Energy project will bring new energy generating technology and needed additional energy capacity to Panama while resolving critical waste disposal needs for this beautiful, ecologically diverse, and environmentally sensitive region. Furthermore, the PEG project is estimated to generate 2,053 direct jobs, 1,861 construction jobs, and 8,919 indirect supplier jobs to boost the regional economy and provide needed jobs and upward mobility to residents. Also, it is envisioned that PEG will make a positive impact on 32,083 Panamanian households and environmental improvement throughout the region.
Value $330M
Phase 1
Set in proximity to the 18th and Vine historic Jazz and a culturally rich enclave of Kansas City, Missouri, the Enterprise Village Ecosystem “EVE” will be a living laboratory that will educate students in Science, Technology, Engineering, Arts, and Math (“S.T.E.A.M.”). When complete, EVE will be a catalyst to inspire:
· urban unity, and economic prosperity
· equity, justice, and environmental impact action
· ethnic inclusiveness, cultural pride, and variety
· entrepreneurship and innovation
· generation of new jobs locally, and beyond
· development of new career pathways for the underserved, and underprivileged
· empowerment of every student to grow, challenge and prosper in pursuit of personal happiness
Value $389M
Phase 1
Sunified Solar Group ("Sunified") is creating artificial intelligence-driven software and a digital intelligence platform that enables a quantum leap in profitability, scalability, and finance-ability for large scale solar utilities.
The Sunified digital intelligence platform creates performance clarity for financiers through its Patented high-fidelity electron measurement and analytics, cost efficiencies for operations and management through its panel level accuracy, and significant profitability for owners through its AI energy trading capabilities. The project will have the most immediate impact on renewable energy production, employment, and Australia’s local economy by creating over 70,136 direct and indirect jobs over the first ten years of operation.
Value $383M
Phase 1
BRADAM has extensive experience in the alternative fuels and green energy sector. BRADAM’s long-term strategy has been to secure proven technology that uses a Carbon Energy Recovery Process to convert any organic material into Synthesis Gas (Syngas). If not used directly as fuel, the Syngas can be further processed into SNG (from processing non-renewable feedstocks) or RNG (from processing renewable feedstocks). The SNG/RNG can then be used to fuel generators, to produce electricity, or injected into the gas pipeline and sold at a premium as a renewable fuel. Alternately, the Syngas can be used to produce high-quality hydrogen for use in fuel cells or converted the gas into Generation II “drop-in” diesel or jet fuel using Fischer Tropsch technology. The project will enable no less than 520,000 direct and indirect jobs in the global community over the first 10 years of operation.
Value $2.5B
Phase 1
This project, when complete will assist in “Providing an assembly line to space” – developing key anchor locations worldwide, combining vertical and horizontal launch capability for a wide range of space vehicles and payloads produced or assembled on site. The strategic locations meet Spaceport Licensing requirements for safety, environment, and airspace integration, with areas for support industries, STEM university capability, satellite, robotics, solar manufacturing, space entrepreneurs, space agencies, and Government The project will include multiple support industries like an MRO (maintenance, repair, overhaul) facility, Satellite, Mission Control/data center, FBO, and Passenger Airport to supply early and continuous cash flow beyond launch services fees and fuel sales. The project will enable no less than 960,000 direct and indirect jobs in the global community over the first 10 years of operation.
Value $4.3B
Phase 1
The Honey Bear Sports and Nutritional Development Project is the brainchild of Mr. Willie Lanier, an NFL Hall of Fame middle line-backer who played for the Kansas City Chiefs. Mr. Lanier was the first African American to play the position in the history of Pro Football. He has a unique understanding of the challenges that face people of color in a system that is extremely comfortable denying inclusion and equal opportunities for people, regardless of their race, religious beliefs, or economic standing in our society.
By focusing on how to improve facilities and grounds for football, Mr. Lanier has focused on developing a scalable model to improve The Historically Black Colleges & Universities (HBCUs) throughout the USA.
HBCUs, traditionally do not have the adequate funding or collective abilities to pay for modern sporting amenities or artificial turf placement to compete with other well-funded universities. The project plans to create over 57,000 direct and indirect jobs throughout the southern states of The United States of America
Value $220M
Phase 1
A mixed-use, mixed-income intergenerational development in the USA, that has weathered for decades the negative consequences of neglect and the intrusion of freeways dividing the city and destroying the vibrancy of neighborhoods. Poverty, high unemployment, and blighted areas are commonplace.
This master plan will be unique and unlike any development in the region.
It will be a transformative educational, entertainment, and quality living complex for the urban core that will use global best practices in renewable energy and power generation that is environmentally sustainable with post-COVID global best practice safety protocols.
Value $271M
Phase 1
This project aims to address the acute food shortages in Bangladesh that impacts the health and wellbeing (nutrition) of its people as well as the growth and stability of its economy. It focuses on rebuilding the agriculture sector – creating employment stability and growth by making farm inputs affordable and accessible, providing critical infrastructures such as cold storage, education, and training as well as transport, marketing, and a diversity of markets.
With the growing refugee population from neighboring Myanmar putting even more stress on food security, this project is elevated in importance to address multiple humanitarian crises.
Value $159M
Phase 1
When complete, Prospect District will be a catalyst to inspire: · urban unity, and economic prosperity· equity, justice, and environmental impact action · ethnic inclusiveness, cultural pride, and variety· entrepreneurship and innovation· available improved health for all· generation of new jobs locally, and beyond · development of new career pathways for the underserved, and underprivileged· empowerment of every student to grow, challenge and prosper in pursuit of personal happiness.
Value $147M
Phase 1
The Medalla Medical and Wellness Center (Medalla) is a newly formed company of experienced medical professionals and businesspeople that plan to provide high-quality and profitable medical and training services in Lviv, Ukraine. Medalla is the Latin meaning for “Healing”. Medalla will focus on four (4) main areas, Oncology, Clinic Wellness, Education, and Research, encourage high-quality medical services in diverse communities, and provide standardized, quality healthcare in Ukraine.
Value $290M
Phase 1
The project will create over 111,000 new jobs during construction and over the first 10 years of operation. In addition, CamEgen will produce 233 million liters of distilled water per annum, 21 MW of electricity from waste to energy, 1,522,000 kg of organic fertilizer, and 53,000 tons of aggregate (used in concrete and road-making).
Value $502M
Phase 1
Contact us to discuss how we can assist you in project design, project funding options, and project sustainability.
Copyright © 2024 Village Green Global - All Rights Reserved.